Call (470) 837-6333Get a free estimate
Tiered segmental block retaining wall under construction. Two tiers of stacked concrete retaining wall blocks are being built on a sloped lakeside lot, with a corrugated black drainage pipe and gravel along the base. Geogrid mesh and black fabric are visible behind the wall, and a worker and a compact loader stand nearby.

Dalton Brothers Masonry Atlanta

Residential Retaining walls in Atlanta

A good retaining wall holds your yard where you put it, and then you forget it's there. What keeps it that way is the part you never see.

Call (470) 837-6333

Request your free estimate

Always free and we get back to you ASAP.

By submitting, you agree to our Terms of Use and Privacy Policy and consent to calls and texts about your project from Dalton Brothers and the local partners matched to your request, including by automated means. Consent is not a condition of any purchase.

Qualified MasonsVerified ProfessionalsFree EstimatesOn Time

What retaining walls involves

A retaining wall holds back soil so you can level a yard, stop a slope from washing out or build planting beds. It looks like a stack of block or stone. But the real work is underground: a compacted gravel base, drainage gravel and a pipe behind the wall, and on taller walls, layers of fabric grid tied back into the soil.

You need one when a slope is too steep to mow, when rain keeps carrying your dirt onto the driveway, or when an old wall has started to lean. Does your yard hold water after a storm? That tells us a lot. We'll walk your Atlanta yard, see where the water goes, and give you a free estimate. The first thing we'll ask is how tall the wall needs to be and what's sitting on top of it.

Signs you need retaining walls

What we handle

Mason building stone retaining wall. A worker in gloves spreads mortar with a trowel on top of a course of cut stone blocks, with a level and a string line set along the wall. Behind the wall are a perforated drain pipe, gravel backfill, and black drainage membrane against the excavated soil.
Mason building stone retaining wall A worker in gloves spreads mortar with a trowel on top of a course of cut stone blocks, with a level and a string line set along the wall. Behind the wall are a perforated drain pipe, gravel backfill, and black drainage membrane against the excavated soil.

How we do it

Segmental walls start with a trench dug to firm soil and filled with gravel, compacted in thin layers with a plate compactor. The first course is buried below grade and leveled both ways with a string line and a four-foot level, because every course above copies it. Behind the wall we place clean drainage gravel and a perforated pipe wrapped in fabric, sloped to an outlet. On taller walls, fabric grid is laid between courses and runs back into the soil.

Mortared walls are a different animal. They need a concrete footing, and they need weep holes so water can leave through the face instead of pushing on it. A solid mortared wall with no weep holes is just a dam. We glue the caps down, and we place the soil behind in layers and compact each one so it doesn't settle later.

How a job with us goes

  1. Free estimate

    We measure the length and height and look at where the water goes. We ask what sits above the wall, like a driveway, a fence or a pool, because that changes the design.

  2. Marking and excavation

    We mark the wall with string and paint and get buried utilities located before we dig. Then we dig back to firm soil, wide enough for the base and the drainage behind it.

  3. Base

    We lay gravel in thin layers and compact every one. A flat, tight base is what keeps the wall from settling.

  4. Wall, drainage and grid

    We stack the courses, check level as we go, and place drainage gravel and pipe behind them. Grid goes in at the heights the design calls for.

  5. Backfill and cap

    We compact soil behind the wall in layers, set the caps and grade the top so surface water runs away from the wall. Then we clean up.

Tiered segmental block retaining walls. Two tiers of gray segmental concrete block retaining wall with a capstone top step down a graded slope beside a house. Gravel fills the base, a black corrugated drain pipe and fabric lie on the left, grid reinforcement sits in the soil above, and a set of block steps is on the right.
Tiered segmental block retaining walls Two tiers of gray segmental concrete block retaining wall with a capstone top step down a graded slope beside a house. Gravel fills the base, a black corrugated drain pipe and fabric lie on the left, grid reinforcement sits in the soil above, and a set of block steps is on the right.

What drives the cost

Height is the biggest driver, because a taller wall needs a deeper base, more block and often grid. Length comes next, then the type of wall, whether that's block, stone or reinforced. Access matters too. If we can get a skid steer to the site, the job moves faster than when we're carrying block by hand. Drainage, how much soil we dig out or haul in, and whether an engineer has to design the wall all change the number. Tearing down a failed wall adds demolition and hauling. We'll go through each piece with you at the estimate.

How long it takes

A typical yard wall takes three days to two weeks. A short block wall lands at the quick end. Long or tall walls, mortared stone, and walls that need engineered drawings take longer. Rain slows excavation and backfill, so we watch the forecast. If a permit or an engineer is involved, that paperwork comes before we start, and it can take longer than the build itself. We'll give you a schedule at the estimate.

Local expertise: residential retaining walls in Atlanta

The red clay of the Georgia Piedmont is typified by the Cecil soil series: very deep, well drained soil on ridges and side slopes, with a red subsoil that averages 35 to 60 percent clay.

What it means for your job

Clay holds water against a wall and does not recover well once it is compacted, so drainage behind a retaining wall and a properly built base under pavers and footings matter more here than the surface material.

Source: USDA NRCS Official Soil Series Description: Cecil →

Atlanta gets about 49.7 inches of rain a year. Late winter, early spring and July are the wettest stretches, and fall, especially October, is the driest.

What it means for your job

Mortar, stucco and sealers need dry time. Fall is the easiest season for repointing and sealing, and summer work is planned around afternoon storms.

Source: Wikipedia: Climate of Atlanta →

Overnight freezes can be expected on about 40 days a year in Atlanta.

What it means for your job

Water that soaks into brick, stone and mortar and then freezes is what pops faces off brick and opens joints. Keeping water out matters more here than in places that rarely freeze, and winter mortar work has to be protected overnight.

Source: Wikipedia: Climate of Atlanta →

In Fulton County, a retaining wall over 4 feet high needs its own permit unless it was already shown and permitted on a land disturbance permit, and each wall takes a separate permit form and fee.

What it means for your job

A site with several walls means several permits. Budget the time and fees for each one before the masonry starts.

Source: Fulton County Public Works: Retaining Walls →

Good to know

Taller walls and walls holding up a driveway, pool or building need an engineer and usually a permit. Ask your Atlanta building department for the height that triggers one. When a wall is engineered, we build it to those drawings. We don't improvise on them. A new wall also can't fix a water source it doesn't address, so a broken pipe or runoff from next door has to be dealt with too. And if the ground under the wall is soft fill, we'll tell you before we dig.

Retaining walls for your business →

Retaining walls questions

Why is my retaining wall leaning?

Almost always trapped water behind it or no reinforcement. It is usually rebuilt with drainage.

Block or stone?

Segmental block is the most economical and engineered for the job. Stone costs more and looks natural.

Can you just push my leaning wall back up?

Rarely. Once a wall has moved, the base or the drainage is the problem. So we usually take it down, fix that, and rebuild.

Do I need a permit?

It depends on the height and what sits above the wall. Your building department sets the rule. We'll tell you at the estimate if your wall is close.

My soil is sandy. Do I still need drainage?

Yes. Even sandy soil gets heavy when it's soaked, and that water has to go somewhere. We give it a pipe and an outlet.

Ready for a free estimate on your masonry job?

Free for property owners. No obligation.

Get my free estimateCall (470) 837-6333
Call nowFree estimate