What retaining walls involves
A retaining wall holds back soil so you can level a yard, stop a slope from washing out or build planting beds. It looks like a stack of block or stone. But the real work is underground: a compacted gravel base, drainage gravel and a pipe behind the wall, and on taller walls, layers of fabric grid tied back into the soil.
You need one when a slope is too steep to mow, when rain keeps carrying your dirt onto the driveway, or when an old wall has started to lean. Does your yard hold water after a storm? That tells us a lot. We'll walk your Atlanta yard, see where the water goes, and give you a free estimate. The first thing we'll ask is how tall the wall needs to be and what's sitting on top of it.
Signs you need retaining walls
Leaning or bulging faceThe wall is losing a fight with the soil behind it. Trapped water or missing reinforcement is the usual cause, and it rarely stops on its own.
Water or crust at the baseWet ground, white mineral stains or a muddy trickle at the bottom means the drainage behind the wall isn't working.
Soil leaking through the jointsIf dirt is sifting out between blocks or stones, the fabric behind the wall has failed or was never there.
Cracks and gaps up topStair-step cracks in mortar, a cap that's shifted, or a gap opening between the wall and your patio all say the wall is moving. Take a photo now and another in a month.
What we handle
Segmental block wallsInterlocking concrete block on a compacted gravel base. It's the most economical choice, it's engineered for the job, and it suits most yard walls.
Mortared stone or brick-faced wallsReal stone or brick set in mortar over a concrete footing. It costs more, and it looks like it grew there. Sometimes the face sits over a block core.
Reinforced concrete block wallsBlock with steel and grout inside. We use it on taller walls or tight spots where there's no room to run grid back into the soil.
Repair or rebuild of a leaning wallWe figure out why it's leaning before we touch it. Most often we take it down, fix the base and drainage, and stack it back up, reusing the block when it's sound.
Mason building stone retaining wall A worker in gloves spreads mortar with a trowel on top of a course of cut stone blocks, with a level and a string line set along the wall. Behind the wall are a perforated drain pipe, gravel backfill, and black drainage membrane against the excavated soil.
How we do it
Segmental walls start with a trench dug to firm soil and filled with gravel, compacted in thin layers with a plate compactor. The first course is buried below grade and leveled both ways with a string line and a four-foot level, because every course above copies it. Behind the wall we place clean drainage gravel and a perforated pipe wrapped in fabric, sloped to an outlet. On taller walls, fabric grid is laid between courses and runs back into the soil.
Mortared walls are a different animal. They need a concrete footing, and they need weep holes so water can leave through the face instead of pushing on it. A solid mortared wall with no weep holes is just a dam. We glue the caps down, and we place the soil behind in layers and compact each one so it doesn't settle later.
How a job with us goes
Free estimate
We measure the length and height and look at where the water goes. We ask what sits above the wall, like a driveway, a fence or a pool, because that changes the design.
Marking and excavation
We mark the wall with string and paint and get buried utilities located before we dig. Then we dig back to firm soil, wide enough for the base and the drainage behind it.
Base
We lay gravel in thin layers and compact every one. A flat, tight base is what keeps the wall from settling.
Wall, drainage and grid
We stack the courses, check level as we go, and place drainage gravel and pipe behind them. Grid goes in at the heights the design calls for.
Backfill and cap
We compact soil behind the wall in layers, set the caps and grade the top so surface water runs away from the wall. Then we clean up.
Tiered segmental block retaining walls Two tiers of gray segmental concrete block retaining wall with a capstone top step down a graded slope beside a house. Gravel fills the base, a black corrugated drain pipe and fabric lie on the left, grid reinforcement sits in the soil above, and a set of block steps is on the right.
What drives the cost
Height is the biggest driver, because a taller wall needs a deeper base, more block and often grid. Length comes next, then the type of wall, whether that's block, stone or reinforced. Access matters too. If we can get a skid steer to the site, the job moves faster than when we're carrying block by hand. Drainage, how much soil we dig out or haul in, and whether an engineer has to design the wall all change the number. Tearing down a failed wall adds demolition and hauling. We'll go through each piece with you at the estimate.
How long it takes
A typical yard wall takes three days to two weeks. A short block wall lands at the quick end. Long or tall walls, mortared stone, and walls that need engineered drawings take longer. Rain slows excavation and backfill, so we watch the forecast. If a permit or an engineer is involved, that paperwork comes before we start, and it can take longer than the build itself. We'll give you a schedule at the estimate.
Local expertise: residential retaining walls in Atlanta
The red clay of the Georgia Piedmont is typified by the Cecil soil series: very deep, well drained soil on ridges and side slopes, with a red subsoil that averages 35 to 60 percent clay.
What it means for your job
Clay holds water against a wall and does not recover well once it is compacted, so drainage behind a retaining wall and a properly built base under pavers and footings matter more here than the surface material.
Atlanta gets about 49.7 inches of rain a year. Late winter, early spring and July are the wettest stretches, and fall, especially October, is the driest.
What it means for your job
Mortar, stucco and sealers need dry time. Fall is the easiest season for repointing and sealing, and summer work is planned around afternoon storms.
Overnight freezes can be expected on about 40 days a year in Atlanta.
What it means for your job
Water that soaks into brick, stone and mortar and then freezes is what pops faces off brick and opens joints. Keeping water out matters more here than in places that rarely freeze, and winter mortar work has to be protected overnight.
In Fulton County, a retaining wall over 4 feet high needs its own permit unless it was already shown and permitted on a land disturbance permit, and each wall takes a separate permit form and fee.
What it means for your job
A site with several walls means several permits. Budget the time and fees for each one before the masonry starts.
Taller walls and walls holding up a driveway, pool or building need an engineer and usually a permit. Ask your Atlanta building department for the height that triggers one. When a wall is engineered, we build it to those drawings. We don't improvise on them. A new wall also can't fix a water source it doesn't address, so a broken pipe or runoff from next door has to be dealt with too. And if the ground under the wall is soft fill, we'll tell you before we dig.