Commercial retaining walls hold up the parts of your site where people drive, park and build. We build them to your engineer's drawings, and we test as we go.
Qualified MasonsVerified ProfessionalsFree EstimatesOn Time
What retaining walls involves
A commercial wall isn't a bigger version of a yard wall. It's an engineered structure with stamped drawings, a permit and inspections. It supports parking lots, building pads and pond edges, so the loads above it are real: delivery trucks, light poles, sometimes the corner of a building. The design sets the base depth, the geogrid length and spacing, the drainage and the fill. Our job is to build exactly that.
You need this when a site has a grade change you can't just slope away, when a pad has to be cut or filled, or when an existing wall has started to move. Property managers call us about walls that are failing. General contractors call us for the wall package on a new site. Either way, we start with the drawings. Do you have a set yet?
Signs you need retaining walls
Bulging faceThe wall is pushing out in the middle or near the bottom. Soil or water is loading it harder than it was built for, so keep vehicles and people away and call us.
Cracked or sunken pavement behind the wallA line of cracks running parallel to the wall, or a dip in the lot, often means the fill behind it is shifting or washing out. We look there first.
Muddy water at the baseSoil fanning out below the wall, or weep holes running brown, means fines are leaving through the drainage. Clear water is normal. Muddy water isn't.
Leaning blocks or opening jointsUnits rotated forward, courses out of line or gaps between them mean the wall is moving. And it's rarely just a block problem.
What we handle
Segmental walls with geogridInterlocking block with layers of geogrid reaching back into compacted fill. It's the usual answer for taller walls at parking lots and building pads.
Reinforced block or concrete wallsTight sites and heavy loads often call for steel and grout in the block, or a poured concrete wall. We place the reinforcing to the drawings and leave it open for inspection before we cover it.
Pond and stormwater wallsThese edges see water rise and fall, so the drainage, fabric and fill details matter even more. A quick drawdown can load a wall from behind.
Repair of failing site wallsWe find out why the wall moved before we touch it. Sometimes a section can be rebuilt, and sometimes the whole wall has to come down and go back up right.
Concrete block retaining wall under construction Workers build a wall of hollow gray concrete blocks, with vertical steel rebar rising from the cores and mortar or grout visible in some of them. Washed gravel backfill, a black drainage pipe wrapped in fabric, and a plate compactor sit behind the wall in an excavated trench.
How we do it
We build to the engineer's design for the soil and the loads above. Base depth, grid length and spacing, drainage and fill are all specified, and we don't swap them for what's handy. The base is compacted crushed stone, set dead level with a laser, because every course above it follows. Geogrid rolls out square to the wall, gets pulled tight and pinned before any fill touches it. Behind the face goes clean drainage stone and a wrapped perforated pipe that runs to a proper outlet.
Compaction is tested as the wall goes up. Fill goes in thin lifts, and we run a plate compactor close to the face and heavier equipment farther back. Heavy machines stay off the zone right behind the wall. When a reading comes up short, we recompact that lift before we stack another course on it.
How a job with us goes
Bid from civil drawings and wall design
We read the drawings and price from the wall design, counting face area, grid and fill. A bid built on a sketch is a guess, and neither of us wants that.
Permit and submittals
We put together the submittals for the block, geogrid and drainage materials and work with you on the permit. What gets approved is what shows up on site.
Excavation and base
We dig to the depths on the drawings and check the subgrade before anything goes in. The base is where a wall succeeds or fails, so we take our time with it.
Wall and compaction testing
We set the courses, lay the grid and backfill in lifts, with density readings taken as we climb. If a lift doesn't pass, we fix it before moving on.
Inspections and engineer's sign-off
We schedule inspections before the work gets buried and clean up any punch items. The job isn't done until the engineer signs off.
Segmental block retaining wall at pond A curved retaining wall built from stacked concrete blocks with a flat cap runs along the edge of a pond. Black geotextile fabric, a roll of fabric, and gravel backfill sit behind the wall on bare soil, and riprap stones line the base at the water.
What drives the cost
Price follows the wall itself. Face area comes first, and height matters nearly as much, because taller walls need deeper bases, longer grid and more fill. We count the grid and fill quantities from the design, and it makes a difference whether the site soil can be reused or stone has to be hauled in. Engineering and testing are part of the job, not extras. Site access counts too. A wide-open pad is one thing, and a tight lot beside an occupied building with limited room for equipment and deliveries is another. We'll walk the site with you and tell you what we see.
How long it takes
Expect weeks, depending on size and inspections. The permit and submittals come before we dig, and material lead times can add to that. Once we're on site, the wall goes up in stages, and inspections have to fit between them. Weather and wet ground can slow excavation and compaction, and we won't rush a lift to make up the time. Tell us your target dates early and we'll plan around them as best we can.
Local expertise: commercial retaining walls in Atlanta
The red clay of the Georgia Piedmont is typified by the Cecil soil series: very deep, well drained soil on ridges and side slopes, with a red subsoil that averages 35 to 60 percent clay.
What it means for your job
Clay holds water against a wall and does not recover well once it is compacted, so drainage behind a retaining wall and a properly built base under pavers and footings matter more here than the surface material.
Atlanta gets about 49.7 inches of rain a year. Late winter, early spring and July are the wettest stretches, and fall, especially October, is the driest.
What it means for your job
Mortar, stucco and sealers need dry time. Fall is the easiest season for repointing and sealing, and summer work is planned around afternoon storms.
Overnight freezes can be expected on about 40 days a year in Atlanta.
What it means for your job
Water that soaks into brick, stone and mortar and then freezes is what pops faces off brick and opens joints. Keeping water out matters more here than in places that rarely freeze, and winter mortar work has to be protected overnight.
In Fulton County, a retaining wall over 4 feet high needs its own permit unless it was already shown and permitted on a land disturbance permit, and each wall takes a separate permit form and fee.
What it means for your job
A site with several walls means several permits. Budget the time and fees for each one before the masonry starts.
We can't price a wall without the wall design. If you only have a sketch, you'll need an engineer first. Guardrails or fences on top are designed with the wall, because posts and impact loads change what the wall has to carry, so they can't be added as an afterthought. We build to the stamped drawings and don't change them in the field. If we hit soft soil or groundwater the design didn't expect, we stop and bring in your engineer, and the scope and schedule may change.