Call (470) 837-6333Get a free estimate
Commercial concrete block building under construction. A single-story building with gray concrete masonry unit (CMU) walls stands unfinished, with vertical rebar sticking up from the top of the walls and open window and door openings framed in wood. Pallets of stacked concrete blocks, a pile of sand, and workers on and near scaffolding are visible on the bare dirt site.

Dalton Brothers Masonry Atlanta

Commercial Concrete block walls in Atlanta

Commercial block walls are engineered structure, and we build them that way. Load-bearing walls, shear walls, fire-rated separations and stair and elevator shafts all get laid to stamped drawings.

Call (470) 837-6333

Request your free estimate

Always free and we get back to you ASAP.

By submitting, you agree to our Terms of Use and Privacy Policy and consent to calls and texts about your project from Dalton Brothers and the local partners matched to your request, including by automated means. Consent is not a condition of any purchase.

Qualified MasonsVerified ProfessionalsFree EstimatesOn Time

What concrete block walls involves

This isn't a garden wall. The drawings tell us the bar size, the spacing, the bond beam locations and the grout strength, and our masons build to that sheet. The special inspector checks the work while the wall is still open. Nobody gets to guess.

You need us if you're adding onto a building, splitting a space into tenant units, or running block for a general contractor on new construction. Maybe an elevator shaft has to go up before anything else. Maybe the code reviewer wants a rated wall between two occupancies. Not sure the drawings are complete? Send them over and we'll walk through them with you. We'll give you a free estimate in Atlanta, with straight numbers and no runaround.

Signs you need concrete block walls

What we handle

Grouting reinforced concrete block wall. A worker in gloves and jeans holds a pump hose and fills the hollow cores of a concrete masonry block wall with grout. Vertical steel rebar rises through the cores, and a string line runs along the wall to keep the courses level.
Grouting reinforced concrete block wall A worker in gloves and jeans holds a pump hose and fills the hollow cores of a concrete masonry block wall with grout. Vertical steel rebar rises through the cores, and a string line runs along the wall to keep the courses level.

How we do it

Reinforcing size and spacing, grout strength and bond beam locations all come from the structural drawings, and we don't change them on our own. Vertical bars sit in the cells and lap as shown. Bond beam block carries the horizontal steel at the levels the engineer calls for. Rated walls use block with the required fire rating, matched to what was submitted.

Grout is placed in lifts, with cleanouts at the base of the cells. The cleanouts let us clear out mortar droppings before we grout, and they let the inspector see that the bars are where they belong. Then we fill the cells in stages and rod or vibrate the grout so it packs in without voids. Skip that step and you've got a hollow spot hiding in a wall that's supposed to be solid.

How a job with us goes

  1. Bid from structural and architectural drawings

    We read both sets. The structural sheets give us the steel and the architectural sheets give us openings and finishes. Then we bid what's drawn and flag anything that doesn't match.

  2. Submittals

    We send in the block, grout and reinforcing for approval before we order. It's cheaper than tearing out a wall because the wrong block showed up.

  3. Layout and laying with special inspections

    We lay out from the slab and control lines, then build the courses with the inspector's visits on the calendar. The steel gets checked before we close it in.

  4. Grouting in lifts

    We fill the cells in stages, not all at once. Too much grout too fast pushes hard on a fresh wall.

  5. Closing openings around other trades' work

    Once the plumbers, electricians and steel crews have set their sleeves and frames, we come back and fit block tight around them. Those gaps are the last thing standing between you and a finished wall.

Concrete block commercial building exterior wall. A long exterior wall built from gray concrete masonry units (CMU) on a commercial building under construction. It has a large open window opening showing an empty interior, two smaller openings, a metal door, and a gravel ground surface.
Concrete block commercial building exterior wall A long exterior wall built from gray concrete masonry units (CMU) on a commercial building under construction. It has a large open window opening showing an empty interior, two smaller openings, a metal door, and a gravel ground surface.

What drives the cost

Price starts with wall area and height, because every square foot has to be laid and taller walls need scaffolding set up and moved. Reinforcing and grout quantities come next. A wall with closely spaced bars and fully grouted cells takes far more steel, grout and labor than one that's partly grouted. Architectural block, like split-face, costs more to buy and takes more care to lay. Schedule matters too. A tight deadline or stacked trades can mean extra hands or odd hours. Send us the drawings and we'll price what's drawn.

How long it takes

We follow the building schedule. Block is often the first structure up after the slab, so we talk with the general contractor early about start dates, block delivery and when the inspector can come out. Grout needs time to cure, and the engineer decides when a wall can take roof or floor loads. We'll plan around that so other trades aren't left waiting on us.

Local expertise: commercial concrete block walls in Atlanta

The red clay of the Georgia Piedmont is typified by the Cecil soil series: very deep, well drained soil on ridges and side slopes, with a red subsoil that averages 35 to 60 percent clay.

What it means for your job

Clay holds water against a wall and does not recover well once it is compacted, so drainage behind a retaining wall and a properly built base under pavers and footings matter more here than the surface material.

Source: USDA NRCS Official Soil Series Description: Cecil →

Atlanta gets about 49.7 inches of rain a year. Late winter, early spring and July are the wettest stretches, and fall, especially October, is the driest.

What it means for your job

Mortar, stucco and sealers need dry time. Fall is the easiest season for repointing and sealing, and summer work is planned around afternoon storms.

Source: Wikipedia: Climate of Atlanta →

Overnight freezes can be expected on about 40 days a year in Atlanta.

What it means for your job

Water that soaks into brick, stone and mortar and then freezes is what pops faces off brick and opens joints. Keeping water out matters more here than in places that rarely freeze, and winter mortar work has to be protected overnight.

Source: Wikipedia: Climate of Atlanta →

In Fulton County, a retaining wall over 4 feet high needs its own permit unless it was already shown and permitted on a land disturbance permit, and each wall takes a separate permit form and fee.

What it means for your job

A site with several walls means several permits. Budget the time and fees for each one before the masonry starts.

Source: Fulton County Public Works: Retaining Walls →

Good to know

We work from drawings, so we can't bid or build a structural wall from a sketch. We don't design walls or stamp plans. If something in the field doesn't match the reinforcing on the sheet, we stop and ask. Any change to the steel needs the engineer's approval, and we won't make it on our own. We also need a footing or slab that's ready, and room to stage block and scaffolding. Special inspections are arranged by the owner, and we work around them.

Concrete block walls for your home →

Concrete block walls questions

Can you infill an old storefront or door opening with block?

Yes, toothed into the existing wall and finished to match. Matching an old finish takes a look at what's there, so we'll check it before we bid.

Are special inspections included?

The owner usually hires the inspector. We schedule our work around the inspections.

Do you build fire-rated walls?

Yes. We use block with the required fire rating, and the assembly on your drawings decides which block and how it's built.

What happens if the steel on the drawings doesn't fit in the field?

We stop and send the question to the engineer. We don't move bars or change spacing without written approval.

Can you price a job before it's awarded?

Yes. Send us the structural and architectural drawings and we'll give you a free estimate in Atlanta.

Ready for a free estimate on your masonry job?

Free for property owners. No obligation.

Get my free estimateCall (470) 837-6333
Call nowFree estimate