Commercial piers and footings are the part of the job nobody sees once the steel goes up, and the part everybody blames if it's off. We build them to the engineer's sizes and we build them plumb.

Call (470) 837-6333

Request your free estimate

Always free and we get back to you ASAP.

By submitting, you agree to our Terms of Use and Privacy Policy and consent to calls and texts about your project from Dalton Brothers and the local partners matched to your request, including by automated means. Consent is not a condition of any purchase.

Qualified MasonsVerified ProfessionalsFree EstimatesOn Time

What piers and footings involves

Piers and pilasters carry beams, canopies and equipment. Footings sit under site walls and enclosures. Ours are reinforced block piers with vertical bars tied into footing dowels, set on footings we form, reinforce and have inspected before any concrete goes in. Every one is built to engineered sizes, not to what looks about right.

You need us when the drawings call for a canopy column, a sign base, a dumpster enclosure or a pad for outdoor equipment. Maybe you're a property manager adding a canopy, or a general contractor with masonry in your scope. Send us the structural sheets and we'll bid from them. Not sure what's in them? Ask. We'll read them with you.

Signs you need piers and footings

What we handle

Brick and block pier on footing. A square pier built from gray concrete block topped with red brick rises from a wooden-formed footing that holds a grid of steel rebar. A steel column with anchor bolts sits on top of the pier, and a worker in a high-visibility shirt stands beside it.
Brick and block pier on footing A square pier built from gray concrete block topped with red brick rises from a wooden-formed footing that holds a grid of steel rebar. A steel column with anchor bolts sits on top of the pier, and a worker in a high-visibility shirt stands beside it.

How we do it

Footings are formed, reinforced and inspected before the pour. We dig to the depth on the drawings and clean the bottom by hand so we're never pouring onto loose dirt. Then we set the forms and tie the rebar up on chairs so it sits where the engineer put it instead of lying in the mud. Dowels get tied in at every pier location and held in place. The inspector looks, and we pour only after that.

Piers are fully grouted with vertical bars tied into the footing dowels. We grout in lifts and consolidate each one so the cells fill solid, and we leave cleanouts at the bottom so the cells start clean. Anchor bolts are set to the steel fabricator's template and held rigid so they don't wander while grout goes in. When the pier is done, we check the bolts with a level and a tape.

How a job with us goes

  1. Bid from structural drawings

    We price off the structural sheets, not a sketch. We read the pier schedule, footing details and anchor bolt plans, then write down what we're assuming so nothing surprises you later.

  2. Layout and excavation

    We lay out from the control points and check dimensions twice before we dig. A pier that lands five inches off is a headache for the steel crew. Then we dig to depth and clean the bottom.

  3. Footing steel, inspection and pour

    We form the footing, set the rebar and dowels, and call for inspection. Concrete doesn't get ordered until that's signed off, since moving a bar is far cheaper than chipping out a footing.

  4. Pier construction and grouting

    Block goes up over the dowels with vertical bars in the cells. We grout in lifts and consolidate it, because a void inside a pier is a weak spot nobody can see.

  5. Anchor bolt survey

    Before we leave, we check bolt location, projection and elevation against the fabricator's template and the drawings. If one is off, we'd rather hear it from our tape than from the steel erector.

Footing trench and finished masonry wall. The left side shows an excavated trench with wooden formwork and steel rebar cages ready for a concrete strip footing. The right side shows a finished gray concrete block wall with brick-faced piers on a concrete base.
Footing trench and finished masonry wall The left side shows an excavated trench with wooden formwork and steel rebar cages ready for a concrete strip footing. The right side shows a finished gray concrete block wall with brick-faced piers on a concrete base.

What drives the cost

Price follows the drawings. The number and size of piers and footings come first, because every one means digging, forming, steel and grout. Reinforcing is next, since heavier bar and tighter spacing take more time to set and tie. Excavation conditions can move the number too, like tight access, rock, or water in the hole. And the tolerance the steel needs counts, because setting anchor bolts to a fabricator's template takes more care than building a plain pier. Have the structural set handy? Send it over and our estimate will show which of these apply to your job.

How long it takes

We sequence this work early in the job, since steel, framing and slabs all depend on it. Each footing waits on inspection, so the schedule bends around the inspector as much as around us. Footings also need time to gain strength before we load them with block. Tell us when the steel is due and we'll work back from that date. If it's tight, we'll say so plainly.

Local expertise: commercial piers and footings in Atlanta

The red clay of the Georgia Piedmont is typified by the Cecil soil series: very deep, well drained soil on ridges and side slopes, with a red subsoil that averages 35 to 60 percent clay.

What it means for your job

Clay holds water against a wall and does not recover well once it is compacted, so drainage behind a retaining wall and a properly built base under pavers and footings matter more here than the surface material.

Source: USDA NRCS Official Soil Series Description: Cecil →

Atlanta gets about 49.7 inches of rain a year. Late winter, early spring and July are the wettest stretches, and fall, especially October, is the driest.

What it means for your job

Mortar, stucco and sealers need dry time. Fall is the easiest season for repointing and sealing, and summer work is planned around afternoon storms.

Source: Wikipedia: Climate of Atlanta →

Overnight freezes can be expected on about 40 days a year in Atlanta.

What it means for your job

Water that soaks into brick, stone and mortar and then freezes is what pops faces off brick and opens joints. Keeping water out matters more here than in places that rarely freeze, and winter mortar work has to be protected overnight.

Source: Wikipedia: Climate of Atlanta →

Good to know

We build to the engineer's drawings. We don't design the sizes or change them in the field. If we dig and find soft fill, groundwater, buried debris or old foundations, we stop and tell you. What happens next is the owner's and engineer's call, and any added work gets priced separately. We don't fabricate or erect the steel, and we can't set anchor bolts without the fabricator's template. Estimates are free, but they're only as good as the drawings and site access we've seen. No drawings, no firm bid.

Piers and footings for your home →

Piers and footings questions

Do you pour the footings or only lay block?

We can do both, and the estimate says which one we're pricing. Either way, the footing gets inspected before anything goes in the hole.

Can you set anchor bolts for steel?

Yes, from the fabricator's template. We hold them rigid during grouting and check them with a level and tape afterward.

Will you bid without structural drawings?

Not a firm number. We'll talk through a rough scope with you, but an engineer sizes these piers and footings and we price what's drawn.

What happens if a footing fails inspection?

We fix it before we pour. It's usually bar spacing, depth or a dirty bottom. Better to catch that in the hole than after the conc