Commercial brick veneer is a designed wall system, and we build it the way the drawings say. Brick goes on the outside, a backup wall sits behind it, and a drainage cavity in between does the real work.
Qualified MasonsVerified ProfessionalsFree EstimatesOn Time
What brick veneer installation involves
Our masons anchor brick to steel studs or block, with the cavity, flashing and movement joints detailed by the architect. The brick carries only itself and sheds the water. Everything behind it has to be right before we lay a single unit. That's why we read the wall section before we talk about brick.
You need us when a new building, a storefront remodel or a recladding job puts brick on the elevation. You also need us when a restaurant or office wants it on an interior wall. Owners, property managers and general contractors send us plans, and we bid from them. Got a set? Send it over. Estimates are free for projects in Atlanta.
Signs you need brick veneer installation
The spec calls for brickYour drawings show brick on the elevation, with the cavity, flashing and joint locations marked. That's a designed system, and we price and build it as drawn.
The facade is failingYou see stains below the windows, loose or cracked brick, or an old skin nobody likes anymore. Recladding can give the building a new face once we know what's behind it.
A tenant wants brick insideA restaurant, shop or office wants an exposed brick wall in a space that has none. Interior thin brick gives that look without the weight.
The space can't shut downCustomers, staff or other trades are still working around the wall. We plan night shifts and dust control before we start.
What we handle
Anchored brick veneer over steel stud or block backupFull-size brick tied back with anchors, over a drainage cavity, with flashing at the base and over openings. It's the standard commercial brick wall.
Thin brick panel and adhered systemsThin brick in panels or adhered to a prepared substrate. It fits where the structure can't carry full brick, and we follow the manufacturer's tested assembly.
Interior thin brick for restaurants, retail and officesFeature walls, bar fronts and entry walls. Much of it goes in overnight so you can open in the morning.
Recladding an existing facadeNew brick over an old building. We survey the wall first, because what's behind the face decides which system fits.
Worker applying thin brick veneer to wall A worker presses a brick slip onto a wall coated with notched mortar over a dark weatherproof membrane. Metal shelf angle flashing, wall ties, and completed brickwork are visible alongside a stack of bricks and a mortar bucket.
How we do it
On a stud backup, we fasten anchors through the sheathing to the studs at the spacing the engineer set, not where it's convenient. Each anchor ties the brick back to the wall and leaves the cavity open. We keep mortar out of the cavity so the weeps can drain. Shelf angles carry the brick at floor lines, so the weight goes to the structure and not to the wall below.
Vertical and horizontal movement joints go where the drawings put them. We keep them clear of mortar and seal them with backer rod and sealant. Brick, steel and concrete all move differently, and a joint gives them room. Adhered systems follow the manufacturer's tested assembly, with the specified substrate, setting material and grout. We don't swap parts to save a trip to the supplier.
How a job with us goes
Bid from drawings
We read the whole set, including the wall sections and flashing details, and price what's drawn. We flag gaps now, because a question is easier to answer before the brick is ordered.
Submittals and sample panel
We send brick, mortar, anchor and flashing data for approval. Then we build a sample panel so the architect sees color, bond and joint before we commit to the whole wall.
Air and water barrier inspected before brick starts
We won't build over a barrier nobody has checked. Once the brick is up, any hole behind it is buried, so we wait for sign-off.
Veneer installation with anchor and flashing inspections
We lay brick, set anchors and install flashing and weeps as we go. Inspectors see the anchors and flashing while they're still exposed.
Sealants, cleaning and closeout
We seal the movement joints and clean the wall in a way the brick can take. Then we walk the job with you and close out the punch list.
Finished brick veneer accent wall A long interior wall is covered in reddish-brown and gray thin brick veneer with light mortar joints, lit by black pendant spotlights. The room has a polished concrete floor, a large storefront window on the left, and a doorway on the right.
What drives the cost
Area comes first, then the system. Full-size anchored veneer and adhered thin brick are priced very differently. Height matters because it means lifts or scaffold. Anchor spacing and shelf-angle requirements add steel, layout and labor. So does the number of movement joints and openings that need flashing. Work in an occupied space adds night shifts, dust control and protection for finished surfaces. The brick you pick can swing things too, especially if it has to match an existing wall. Send us the drawings and we'll price what's on them.
How long it takes
Our schedule follows the construction schedule. We start once the backup wall and barrier are approved, and we sequence around windows, flashing and other trades. Cold or wet weather can slow mortar work outside. Interior tenant work is often done at night over one to two weeks, so the space is clean and open by morning. Tell us your dates early and we'll tell you straight if they work.
Local expertise: commercial brick veneer installation in Atlanta
Atlanta gets about 49.7 inches of rain a year. Late winter, early spring and July are the wettest stretches, and fall, especially October, is the driest.
What it means for your job
Mortar, stucco and sealers need dry time. Fall is the easiest season for repointing and sealing, and summer work is planned around afternoon storms.
Overnight freezes can be expected on about 40 days a year in Atlanta.
What it means for your job
Water that soaks into brick, stone and mortar and then freezes is what pops faces off brick and opens joints. Keeping water out matters more here than in places that rarely freeze, and winter mortar work has to be protected overnight.
The backup wall and barrier must be complete and approved before we start. We build the wall, but we don't engineer it, and the architect's drawings govern. If the drawings conflict, we stop and ask before building. Adhered thin brick has height limits set by code and by the manufacturer, so some tall walls can't take it. And if the backup is damaged or out of plane, that has to be fixed first. Brick can't hide it.