Call (470) 837-6333Get a free estimate
Concrete block walls under construction. Two workers lay gray concrete masonry blocks on a partly built wall enclosing the backyard of a single-story house. A pallet of stacked blocks and a wheelbarrow sit on the bare sandy ground, and rebar sticks up from the wall columns.

Dalton Brothers Masonry Atlanta

Residential Concrete block walls in Atlanta

Concrete block is the standard structural wall material in Florida homes, and it's what we build with when you want a wall that's meant to stand up to wind.

Call (470) 837-6333

Request your free estimate

Always free and we get back to you ASAP.

By submitting, you agree to our Terms of Use and Privacy Policy and consent to calls and texts about your project from Dalton Brothers and the local partners matched to your request, including by automated means. Consent is not a condition of any purchase.

Qualified MasonsVerified ProfessionalsFree EstimatesOn Time

What concrete block walls involves

Residential block work for us means privacy walls, additions, garages, sheds and foundation stem walls. Every one starts the same way, with a concrete footing in the ground, steel bars tied into it and hollow block stacked over them. Then we fill the cells with grout so the wall works as one solid piece instead of a pile of boxes.

So when do you need us? Maybe you want a wall between your yard and the street. Maybe you're adding a room and the new block has to tie into the old. Maybe a shed needs a proper stem wall under it, or the block at the back of your lot has cracked and started to lean. We'll come out, look at it, and give you a free estimate in Atlanta. No pressure, just a straight answer.

Signs you need concrete block walls

What we handle

Mason building reinforced concrete block wall. A worker in jeans and a gray shirt uses a trowel to spread mortar along the top of a concrete masonry unit (CMU) wall. Vertical and horizontal steel rebar run through the wall, and a wheelbarrow of mortar sits in the background on the construction site.
Mason building reinforced concrete block wall A worker in jeans and a gray shirt uses a trowel to spread mortar along the top of a concrete masonry unit (CMU) wall. Vertical and horizontal steel rebar run through the wall, and a wheelbarrow of mortar sits in the background on the construction site.

How we do it

We lay block on a concrete footing, with steel bars set into the footing and run up through the cells. Those cells are then filled with grout, which bonds the steel and block into one unit. We stretch a mason's line for every course and check each one with a level, because a wall that starts a little off only gets worse as it climbs. Joints are struck clean and even.

A reinforced, grouted beam ties the top of the wall together. We usually form it with U-shaped bond beam block, so the steel sits inside the top course and the grout locks it in place. Walls are finished in stucco or left as block. Stucco goes on in coats over clean, damp block so it grips. If you want the block showing, we tool the joints and you can paint or seal it later.

How a job with us goes

  1. Free estimate

    We walk your property, measure and talk through what you want the wall to do. If permit drawings are required, we prepare them, since the building department won't let us dig without them.

  2. Footing

    We have underground utilities marked, then dig the trench, set the rebar and pour. The footing carries everything above it, so the steel goes in before the concrete, never after.

  3. Block laid

    We build the corners first, pull a line between them and fill in the courses. Vertical steel comes up through the cells as we go, so it stays where the drawings put it.

  4. Grout and top beam

    We fill the cells and pour the beam along the top. The inspector wants to see the steel before grout buries it, and so do we, so inspections happen at the right moments.

  5. Stucco or cap

    We finish with stucco or a cap, or leave the block exposed if that's your choice. A cap sheds water off the top, which is where walls take the most abuse.

Residential concrete block wall construction. The left side shows a course of gray concrete blocks laid on a footing in a trench, with vertical steel rebar rising through the hollow cores and a worker standing alongside. The right side shows a finished block wall with window and door openings and wooden roof trusses set on top of a house under construction.
Residential concrete block wall construction The left side shows a course of gray concrete blocks laid on a footing in a trench, with vertical steel rebar rising through the hollow cores and a worker standing alongside. The right side shows a finished block wall with window and door openings and wooden roof trusses set on top of a house under construction.

What drives the cost

Price follows the wall. Length and height come first, since every extra foot means more block, more steel and more grout. The footing is next. A taller wall needs a wider, deeper one, and soft or wet soil can make it bigger still. Steel and grout add up, but they're not where we trim, because they're what holds the wall up. Finish matters too. Plain block costs less than stucco, and stone or brick facing costs more. Permit fees and engineering, when your wall needs stamped drawings, round it out. We put every piece in writing with your free estimate, so you can see where the money goes.

How long it takes

A privacy wall is about one to two weeks including inspections. That's a typical run, not a promise. Longer walls take longer, and so does a stretch of rain, because we won't pour a footing into a flooded trench. Inspections have to be scheduled with the building department, and we can't rush them. Stucco is its own step, with time for each coat to set. Additions, garages and stem walls run longer than a yard wall, and we'll give you a realistic schedule when we write up your estimate.

Local expertise: residential concrete block walls in Atlanta

The red clay of the Georgia Piedmont is typified by the Cecil soil series: very deep, well drained soil on ridges and side slopes, with a red subsoil that averages 35 to 60 percent clay.

What it means for your job

Clay holds water against a wall and does not recover well once it is compacted, so drainage behind a retaining wall and a properly built base under pavers and footings matter more here than the surface material.

Source: USDA NRCS Official Soil Series Description: Cecil →

Atlanta gets about 49.7 inches of rain a year. Late winter, early spring and July are the wettest stretches, and fall, especially October, is the driest.

What it means for your job

Mortar, stucco and sealers need dry time. Fall is the easiest season for repointing and sealing, and summer work is planned around afternoon storms.

Source: Wikipedia: Climate of Atlanta →

Overnight freezes can be expected on about 40 days a year in Atlanta.

What it means for your job

Water that soaks into brick, stone and mortar and then freezes is what pops faces off brick and opens joints. Keeping water out matters more here than in places that rarely freeze, and winter mortar work has to be protected overnight.

Source: Wikipedia: Climate of Atlanta →

In Fulton County, a retaining wall over 4 feet high needs its own permit unless it was already shown and permitted on a land disturbance permit, and each wall takes a separate permit form and fee.

What it means for your job

A site with several walls means several permits. Budget the time and fees for each one before the masonry starts.

Source: Fulton County Public Works: Retaining Walls →

Good to know

Structural walls and most taller walls need a permit and inspections, and we work through that process with you. We can't skip steel or grout to save cost, and we won't build a wall without them. If we can't confirm your property line, we'll ask you to get a survey before we build near it. If your wall is cracking because of drainage or tree roots, we'll tell you, because patching the block won't solve that. HOA approval is yours to get, though we'll gladly supply drawings or a sketch.

Concrete block walls for your business →

Concrete block walls questions

Why does block need steel and grout?

Hollow block alone resists little sideways force. Steel and grout are what let the wall stand up to wind.

Can a block wall be made to look better?

Yes: stucco, paint, stone or brick facing, or split-face block.

Why did my block wall crack?

Usually the footing settled, roots pushed on it, or the wall has little steel inside. We look at the crack pattern and the ground around it before we suggest a fix.

Do I need a permit for a yard wall?

Structural walls and most taller walls do. Rules differ by city, so tell us where you are and we'll check with your building department.

Can you match my old block when you repair it?

We can get close. Block and stucco texture vary, so we bring samples and show you the nearest match before we start.

Ready for a free estimate on your masonry job?

Free for property owners. No obligation.

Get my free estimateCall (470) 837-6333
Call nowFree estimate