Call (470) 837-6333Get a free estimate
Brick and stucco perimeter wall. A long perimeter wall with brick columns, a lower brick base, and stucco panels topped with pale caps runs beside a road. Young trees and shrubs are being planted in bare soil in front of it, and a worker with a wheelbarrow is visible in the distance.

Dalton Brothers Masonry Atlanta

Commercial Perimeter and screen walls in Atlanta

A perimeter wall tells everyone where your property ends, and a screen wall hides what you'd rather the street didn't see. We build both to stand straight and take the wind.

Call (470) 837-6333

Request your free estimate

Always free and we get back to you ASAP.

By submitting, you agree to our Terms of Use and Privacy Policy and consent to calls and texts about your project from Dalton Brothers and the local partners matched to your request, including by automated means. Consent is not a condition of any purchase.

Qualified MasonsVerified ProfessionalsFree EstimatesOn Time

What perimeter and screen walls involves

These walls separate a commercial site or subdivision from its neighbors, and they hide loading docks, dumpsters and equipment yards. Most are reinforced block or precast panel on engineered footings, finished to match the buildings they serve. They run long, and that's what sets them apart from a garden wall. We work with owners, property managers and general contractors.

You usually need one because the site plan approval requires it. Or because a new house went up next to your lot, or a section started to lean. Either way, a small mistake at the footing shows up all down the line, so we check the layout twice before we pour anything. Send us your site plan and wall details and we'll give you a free estimate in Atlanta.

Signs you need perimeter and screen walls

What we handle

Mason building split-face block wall. A worker in a gray shirt and jeans holds a trowel beside a partially built split-face concrete block wall with taller pillars and flat concrete cap pieces. A mortar tub sits in the foreground, and a commercial building with brick and stucco walls stands behind the wall.
Mason building split-face block wall A worker in a gray shirt and jeans holds a trowel beside a partially built split-face concrete block wall with taller pillars and flat concrete cap pieces. A mortar tub sits in the foreground, and a commercial building with brick and stucco walls stands behind the wall.

How we do it

Most of our walls are reinforced concrete block or precast panels set on engineered footings. The engineer sets the footing depth and the steel, and we build to the drawings. Block walls get vertical rebar in the cells and horizontal reinforcement in the courses. Then we grout the cells so the steel and block work as one piece. Pilasters go in at regular spacing to brace the wall against wind. Control joints let it move with the heat instead of cracking.

Then comes the finish. Stucco over block gives a clean, even face. Split-face block is rugged and needs little else. Brick matches a building or a neighborhood entry. Whichever you pick, we set a cap on top. The cap keeps water out of the wall and gives the whole run a finished line.

How a job with us goes

  1. Bid from the plans

    We read your site plan and wall details first, then walk the line if we can. Length, height, grade changes and gates all move the bid, so we'd rather see them than guess.

  2. Permit and utility locate

    We work with you on the permit paperwork and call for the utility locate before anyone digs. The footing runs the full length of the line, and nobody wants to hit a buried cable.

  3. Layout and footings

    We string the line and mark every pilaster, then dig and set the rebar. The inspector looks at the steel before we pour, and we fix anything he flags before concrete goes in.

  4. Block and grout

    We lay block to the string, set vertical steel and grout the cells in lifts. Inspections happen here too. Grouting in lifts keeps voids out of the cells.

  5. Finish and cap

    We apply the stucco, or finish the split-face or brick, and set the cap. Then we clean up the line and walk it with you.

Masonry screen wall with metal gate. A tall enclosure of split-face concrete masonry block with thicker pilasters and capped tops stands beside a large commercial building. A double swing gate with dark perforated metal panels sits in the wall and opens onto a concrete paved area.
Masonry screen wall with metal gate A tall enclosure of split-face concrete masonry block with thicker pilasters and capped tops stands beside a large commercial building. A double swing gate with dark perforated metal panels sits in the wall and opens onto a concrete paved area.

What drives the cost

Linear feet drive the price first, then height, because taller walls need deeper footings and more steel. Engineering for wind shapes the footing and pilaster spacing, so that counts too. The finish matters. A plain block face is simpler than stucco, and brick takes the most labor. Then there's site access along the property line. If we can pull a block truck and a mixer alongside the wall, the work moves fast. If everything has to be carried or pumped over a fence, it takes longer and costs more. Grade changes, corners and gate openings add work as well. Send us the plans and we'll price what's actually there.

How long it takes

Weeks to months, mostly depending on how long the wall is. A short screen wall around a dumpster pad goes up quickly. A subdivision perimeter takes longer because we build it in sections. Permits, the utility locate and inspections add time, and grout and stucco need decent weather to cure right. Rain and cold slow us down, and we'll tell you when the schedule shifts.

Local expertise: commercial perimeter and screen walls in Atlanta

The red clay of the Georgia Piedmont is typified by the Cecil soil series: very deep, well drained soil on ridges and side slopes, with a red subsoil that averages 35 to 60 percent clay.

What it means for your job

Clay holds water against a wall and does not recover well once it is compacted, so drainage behind a retaining wall and a properly built base under pavers and footings matter more here than the surface material.

Source: USDA NRCS Official Soil Series Description: Cecil →

Atlanta gets about 49.7 inches of rain a year. Late winter, early spring and July are the wettest stretches, and fall, especially October, is the driest.

What it means for your job

Mortar, stucco and sealers need dry time. Fall is the easiest season for repointing and sealing, and summer work is planned around afternoon storms.

Source: Wikipedia: Climate of Atlanta →

Overnight freezes can be expected on about 40 days a year in Atlanta.

What it means for your job

Water that soaks into brick, stone and mortar and then freezes is what pops faces off brick and opens joints. Keeping water out matters more here than in places that rarely freeze, and winter mortar work has to be protected overnight.

Source: Wikipedia: Climate of Atlanta →

In Fulton County, a retaining wall over 4 feet high needs its own permit unless it was already shown and permitted on a land disturbance permit, and each wall takes a separate permit form and fee.

What it means for your job

A site with several walls means several permits. Budget the time and fees for each one before the masonry starts.

Source: Fulton County Public Works: Retaining Walls →

Good to know

Wall height and location are fixed by the approved site plan. We can't make a wall taller or move it a few feet because it would look better, and any change goes back to the engineer or the city first. Work from the neighbor's side may need their permission, and we won't cross a property line without it. If a wall is leaning because of soil movement or water pushing on it, the cause has to be dealt with first. Otherwise a rebuilt section will lean the same way again.

Perimeter and screen walls questions

A section of our community wall is leaning. Can it be repaired?

Usually by rebuilding the section on a new footing and matching the finish. We look at why it leaned first, since poor drainage or soft soil will push the new section over too.

Who maintains a perimeter wall?

Normally the owner or association named in the plat, so check your documents. If it's unclear, we can look at the plat with you.

Why does a long wall have those thick columns?

Those are pilasters. They brace the wall against wind, and without them a long straight wall acts like a sail.

Will the wall crack?

Control joints are there on purpose. They let the wall move with the weather so any cracking happens at the joint instead of across the face.

Do you need the site plan before giving an estimate?

Yes, it helps a lot. Send the site plan and wall details, and we'll look at the line in person too. The estimate is free.

Ready for a free estimate on your masonry job?

Free for property owners. No obligation.

Get my free estimateCall (470) 837-6333
Call nowFree estimate