Call (470) 837-6333Get a free estimate
Commercial building with new brick walls. A single-story commercial building under construction has freshly laid red brick walls, a dark metal canopy, and large glass storefront openings. A mason works at the corner wall, with pallets of bricks, a wheelbarrow, a sawhorse table, and scaffolding nearby.

Dalton Brothers Masonry Atlanta

Commercial Bricklaying and new brick walls in Atlanta

Commercial brick is built from drawings, and we build it the way the drawings say. Bond, color, joint and everything behind the brick get laid out before the first unit goes up.

Call (470) 837-6333

Request your free estimate

Always free and we get back to you ASAP.

By submitting, you agree to our Terms of Use and Privacy Policy and consent to calls and texts about your project from Dalton Brothers and the local partners matched to your request, including by automated means. Consent is not a condition of any purchase.

Qualified MasonsVerified ProfessionalsFree EstimatesOn Time

What bricklaying and new brick walls involves

Most of our commercial work is brick veneer over block or steel studs. Our masons lay it to the architect's bond, color and joint, and we work around the other trades who share the wall: framers, window installers, roofers and the crew doing the weather barrier. A brick wall is only as good as what's behind it, so we pay attention to all of it.

You need us when brick shows up on the elevations of a new building, when an addition has to look like it was always there, or when the site needs walls and sign bases that match the building. Send us the drawings and we'll tell you what we see. Are you a general contractor in Atlanta with a bid due? Start there.

Signs you need bricklaying and new brick walls

What we handle

Bricklayer building cavity brick wall. A gloved worker spreads mortar with a trowel along the top of a new red brick course, with a guide line stretched along the wall. Behind the bricks are a concrete block inner wall, metal wall ties and a dark damp-proof membrane with flashing.
Bricklayer building cavity brick wall A gloved worker spreads mortar with a trowel along the top of a new red brick course, with a guide line stretched along the wall. Behind the bricks are a concrete block inner wall, metal wall ties and a dark damp-proof membrane with flashing.

How we do it

Veneer is anchored to the backup wall with ties at the spacing on the drawings. On taller buildings it rides on shelf angles bolted to the structure, and we leave the soft joint under each angle open for movement. Flashing goes at the base, over openings and under the shelf angles. Weeps at the bottom of the cavity give water a way out. Movement joints go where the drawings put them, and we keep them clear of mortar.

Mortar and brick are submitted for approval before work starts, along with ties and flashing. We lay to a line and check plumb and level with a story pole and a four-foot level. Then we keep the cavity clean, because a layer of mortar droppings can plug the weeps and trap water behind the wall. Mortar type follows the spec, and we don't swap it to save a day.

How a job with us goes

  1. Bid from drawings and specifications

    We take off brick quantities from the elevations and read the specs for mortar, ties and flashing. Questions go to the general contractor in writing before we price, because a vague detail becomes a change order later.

  2. Submittals

    brick, mortar, ties, flashing: We send product data and brick samples for approval. Nothing gets ordered until the architect signs off, since changes after that cost time.

  3. Sample panel built and approved

    We build a panel showing bond, color range, joint tooling and the flashing detail. The architect and inspector look it over, and it stays up as the standard for the whole wall.

  4. Layout, laying and inspections

    We lay out from the corners, set the scaffold and lay to the panel. Inspectors see the ties and flashing before we cover them.

  5. Washdown and punch list

    We clean with the method approved on the panel, and we test it on a small spot first. Then we walk the wall with the general contractor and fix what's on the list.

New brick walls in unfinished interior. A freshly built red brick wall forms a corner enclosure with dark metal door frames, set in a bare concrete-floored space with exposed ceilings. Gray concrete block shows inside the openings and on the outer walls, with windows letting in daylight.
New brick walls in unfinished interior A freshly built red brick wall forms a corner enclosure with dark metal door frames, set in a bare concrete-floored space with exposed ceilings. Gray concrete block shows inside the openings and on the outer walls, with windows letting in daylight.

What drives the cost

Price starts with square footage and the brick you pick. Standard modular brick is simpler to buy and lay than a specialty size or a blend mixed from several pallets. Building height matters because tall walls need scaffolding and shelf angles, and that adds labor before a brick is set. Pattern complexity moves the number too, since soldier courses, stack bond and corbels take longer than running bond. Then there's schedule pressure, which can mean more masons and winter protection, and site access, which decides how far we carry brick and where the scaffold goes.

How long it takes

Our schedule follows the general contractor's, so we plan around the dates for the backup wall, windows and flashing. Brick lead times can run weeks, so selection happens early. We'd rather see it settled before we bid than after. We can't lay veneer until the backup wall is up and the barrier is ready. Cold weather means protecting fresh mortar, which can slow a winter job. Tell us your dates and we'll say honestly whether they work.

Local expertise: commercial bricklaying and new brick walls in Atlanta

Atlanta gets about 49.7 inches of rain a year. Late winter, early spring and July are the wettest stretches, and fall, especially October, is the driest.

What it means for your job

Mortar, stucco and sealers need dry time. Fall is the easiest season for repointing and sealing, and summer work is planned around afternoon storms.

Source: Wikipedia: Climate of Atlanta →

Overnight freezes can be expected on about 40 days a year in Atlanta.

What it means for your job

Water that soaks into brick, stone and mortar and then freezes is what pops faces off brick and opens joints. Keeping water out matters more here than in places that rarely freeze, and winter mortar work has to be protected overnight.

Source: Wikipedia: Climate of Atlanta →

Good to know

Pricing needs drawings. We can talk through a project by phone, but we won't put a number on a wall we haven't seen on paper. Changes after the brick is ordered affect cost and schedule, and a different brick can mean a new sample panel. We lay masonry to what's drawn. We don't design the wall, size the shelf angles or straighten a backup wall that's out of plumb, though we'll flag a problem in writing if we spot one. This page covers new brick, so repair work on an older building is a separate conversation.

Bricklaying and new brick walls for your home →

Bricklaying and new brick walls questions

Do you bid from plans?

Yes. Send the drawings and specifications and we'll return a bid. Include the addenda, because they often change the masonry.

What do you need to price a wall?

Elevations, wall sections and the masonry spec section. The wall sections show ties, flashing and shelf angles, and that's where most of the labor hides.

Can you match an existing building for an addition?

We source the original brick where it's still made, or the closest available blend. Then we build a sample panel for approval.

Will you coordinate with the other trades?

We do. We talk with the general contractor about when the backup wall, windows and flashing will be ready, and about where our scaffold can stand.

What if the brick we picked has a long lead time?

Tell us early. We can price alternates that look close, and we'll build the sample panel with whichever one you choose.

Ready for a free estimate on your masonry job?

Free for property owners. No obligation.

Get my free estimateCall (470) 837-6333
Call nowFree estimate